Development of the annexation area will necessitate the construction of a new collector street that will provide connection between the annexation area and the highways, and to the existing local network within Town. The road will follow the same 6th St E. (north-south) alignment of the water and sewer mains, and will swing west to intersect with Highway 22 and Willow Ridge Blvd south of the Oilfields Regional Hospital.
The eventual build-out of the annexation area will necessitate the improvement (signalization or traffic circle) of 6 intersections within Town. The full build-out of the annexation will significantly increase traffic volumes on the highways within town, and on 4th Ave SE.